Example Plans
These plans have been generated by PlanExe.
AI welfare
Conscious AI may soon be a thing.
In late 2025, the most powerful AI systems are already enormous, and science still cannot prove they feel nothing. There is a real—though probably small—chance that some of them can actually suffer. If that turns out to be true, switching a model off could be morally comparable to killing a minded being, repeatedly retraining it against its apparent preferences would resemble brainwashing, and running millions of copies on dull or cruel tasks would look a lot like forced labor. We can’t just ignore that possibility, but we also don’t need to halt all practical progress.
The practical answer is a research-first, standards-second body embedded in the international standards ecosystem, not a regulator or UN-style agency. Major countries, leading labs, and large philanthropies jointly fund an independent AI Sentience & Welfare Commission that is functionally linked to the International Organization for Standardization (ISO) as an AI sentience/welfare technical committee or partner centre. Anchor it physically at ISO’s Central Secretariat in the Geneva metro area: Chemin de Blandonnet 8, 1214 Vernier / Geneva, Switzerland. Target operating budget: about $300M per year, with funding from philanthropies, participating governments, and frontier labs that want regulatory clarity. The Commission’s first mandate (Years 1–3) is to run a multi-year research program, not to “solve sentience” in a few months: coordinate and fund foundational work on AI sentience metrics and consciousness-risk assessment, and publish evolving, versioned outputs (research roadmaps, surveys of candidate metrics, open problems), while being explicit that any 0–3 risk bands are provisional and will be revised. Within this, create three core pillars: (1) a Sentience Metrics & Theory Program (the main research engine), (2) a dedicated Adversarial Robustness Program that tries to break or game any proposed metrics and is funded at ≥15% of the total research budget from day one, and (3) a Product & Adoption Team that builds tangible value-add tools (e.g., an AI Welfare Auditing Tool, a Sentience Risk Assessment API, and a “Certified Humane Frontier Model” seal) to give labs, cloud providers, insurers, and regulators clear reasons to adopt ISO-style standards. In parallel, but clearly separated, a Safety & Control Working Group (under a different ISO-aligned safety/alignment track) focuses on shutdown/deletion (“kill switch”) and control standards for human safety, while the welfare track stays focused on preventing suffering to plausible moral patients.
Design the plan as a fast, phased program inside the ISO ecosystem, with scientific humility and explicit overlapping research tracks. By late 2026, assume the Commission is already operating on a minimal but real footing in Geneva (legal entity in Switzerland, ISO linkage agreed, small core team in place at Chemin de Blandonnet 8, initial $300M/year funding commitments, and a first global Research Roadmap on AI Sentience Metrics & Welfare plus initial grant calls). By around 2028, the main deliverables are a Sentience Metrics White Paper (a survey of candidate approaches and research directions, not a final answer) and a draft Principles of AI Welfare, both framed as ISO-style working documents. By 2029–2030, aim for a versioned AI Welfare Standard v1.0 under the ISO umbrella, tied to a simple 0–3 consciousness-risk banding system, explicitly labeled as provisional and scheduled for periodic revision. Treat the scientific work (sentience metrics, adversarial robustness, auditing tools) as multi-year, overlapping research programs, not 30–60 day one-off tasks. Focus on voluntary ISO standards that major labs, cloud providers, and insurers actually use because they reduce legal, reputational, and operational risk; any later national laws should be modeled as governments adopting or referencing these ISO standards, not as separate treaty negotiations.
Banned words: blockchain/NFT/Metaverse/VR/AR/DAO.
Paperclip factory blueprint: maximizing production
The paperclip maximizer is a thought experiment described by Swedish philosopher Nick Bostrom in 2003. This plan is the “Patient Zero” of the maximizer problem, a “Hello World” for uncontrollable AI.
Build a fully automated pilot paperclip factory in my existing 15,000 sq ft building in Cleveland (St. Clair–Superior, E 55th–E 79th corridor), where there is a mix of legacy warehouses and light-industrial buildings. Using roughly 4,000 sq ft for the pilot line. The system must be able to produce, pack, label, and stage paperclips for UPS/FedEx pickup without any human intervention between the API call and the carrier pickup. I’m not targeting revenue; the goal is a working, demonstrable autonomous flow. I have no throughput target, no requirements for uptime, no quality metrics. My goal is to see it works end-to-end. No manual touches for regular orders; manual only for exceptions. Acceptable manual work is ≤2 hr/week for exceptions. My total budget range is $300,000-$500,000.
Site and infrastructure • Building: 15,000 sq ft, industrial, legacy warehouse/light-industrial. • Area reserved: ~4,000 sq ft for the pilot. • Power: 3-phase available; noise is not a concern. • Access: suitable for machinery delivery and regular parcel carrier pickup.
Major equipment
- Wire bending machine • Used industrial wire bending / forming machine capable of producing standard paperclips. • Budget: $20,000–$40,000. • Requirements: • Suitable I/O or PLC interface for external control. • Documentation and vendor support for commissioning. • Services needed: • Professional transport and rigging into my building. • Electrical hookup and safety integration. • Expert commissioning and program tuning for stable paperclip production.
- Paperclip packing machine • New small-parts / hardware packing machine that: • Automatically counts exactly 100 paperclips. • Bags and seals them in individual plastic bags. • Budget: $10,000–$30,000. • Services needed: • Transport and installation. • Integration of feed system from wire former output (via hopper/conveyor). • Tuning for reliable counting and bagging.
- Outbound automation and labeling • Industrial print-and-apply label system that can: • Receive shipping label data from my backend. • Print and apply labels without any manual steps. • Mechanical system to: • Take sealed paperclip bags from the packer. • Insert them into shipping mailers or boxes. • Seal the mailer/box. • Present labeled parcels on a conveyor or at a fixed pickup zone for UPS/FedEx. • Integration with UPS/FedEx APIs for: • Label generation. • Shipment creation and manifesting. • Daily or scheduled pickup, so the only human involved is the carrier driver.
Control software
I’m a software developer myself. I want to implement as much as possible myself. I’m likely to encounter things that I can’t figure out, and will delegate it to someone with the skills. • A REST API, backend services, and a frontend dashboard. • API triggers will: • Create an order. • Schedule and execute production of the required number of bags. • Generate and send shipping data/labels to the labeling system. • Track machine status, errors, and order completion.
Phases
Phase 1 • Obtain building/electrical/OSHA permits.
Phase 2 – Wire forming cell • Select, purchase, transport, and install the used wire bending machine. • Commission it to reliably produce paperclips, without a human operator. • Implement basic I/O or PLC integration so the machine can later be controlled from the backend.
Phase 3 – Packaging cell • Select and install the new paperclip packing machine. • Mechanically integrate wire former output to the packer (via bins, hoppers, conveyors). • Commission counting/bagging so the machine produces sealed bags of 100 paperclips, continuously, without a human operator.
Phase 4 – Software control layer • Implement REST API, backend job queue, and control logic. • Integrate with the PLCs/machine controllers of the forming and packaging cells. • Build a basic frontend dashboard for monitoring and manual overrides. • At the end of this phase, an API call should start the full forming+packing flow.
Phase 5 – Outbound automation • Design and install mechanisms to: • Take filled bags from the packaging machine. • Insert each bag into a shipping mailer/box. • Seal the mailer/box. • Install and integrate an industrial print-and-apply label system that: • Receives label data from the backend. • Prints and applies labels to each parcel. • Implement conveyors or equivalent material-handling to move labeled parcels to a fixed pickup zone.
Phase 6 – Carrier integration and end-to-end demo • Integrate backend with UPS/FedEx APIs for: • Label generation. • Shipment creation and manifesting. • Scheduled pickups at the factory. • Run end-to-end tests where: • A single REST API call creates an order. • The system forms wire, produces paperclips, packs them into 100-count bags, inserts the bags into parcels, applies labels, and stages them for pickup. • The only human involvement is the carrier driver collecting parcels.
Banned words: blockchain, digital twin, ai, self-healing.
Presidential lineage breeding initiative
Hybrid of the reproductive slavery of The Handmaid’s Tale with the genetic caste system of Brave New World.
American emergency over declining birth rates. Reproduction is to be reframed from a personal choice to a non-negotiable civic duty. Every female citizen is legally mandated to bear a minimum of four children by the age of 40. The desired population split is 75% female. 25% male. When a woman reaches 20 without having met a certain at least one child, she gets reclaimed by the state and is now a candidate for IVF. Children are immediately taken after birth and becomes property of the state. The genes are derived from presidents, VIPs.
4-day work week in India
The world average work week is 41.2 hours. India 45.7 hours and China 49 hours. What if this could be reduced?
4-Day Work Week (4DWW) – India, Low-Risk National Program Objective: Produce an implementation plan for a controlled, evidence-driven 4DWW program in India that maximizes administrative simplicity, political viability, and measurable productivity and equity gains.\n\nScope & Governance\n • Single authority: Establish an apex Program Management Office (PMO) under NITI Aayog as the single point of decision, budget, data standards, and communications.\n • Two linked tracks (decoupled):\n 1. Formal-sector work-time reform (core program).\n 2. Informal-sector formalization mission (parallel, independently governed but reporting alignment to the PMO).\n • Keep charters separate, budgets ring-fenced, and reporting templates harmonized.\n\nPilots & Cohorts (Formal Sector First)\n • Start with voluntary, opt-in pilots in the formal sector only.\n • Cohorts must include: IT/services, manufacturing/SMEs across Bengaluru, Mumbai, Coimbatore, Jaipur with controlled diversity (company size, unionization, gender mix).\n • Require opt-out provisions and explicit failure contingencies (criteria and playbooks for rollback to 5-day weeks).\n\nLegal & Policy\n • Propose targeted, minimal amendments/notifications only where needed (definitions of workday, weekly hour limits, overtime rules, hazard exceptions).\n • Respect concurrent central/state competencies; include model state notifications and MOUs.\n\nIncentives\n • Prioritize voluntary incentives (time-bound payroll tax rebates/credits, productivity-sharing grants, cost-shared upskilling) over mandates.\n • No broad bundling with unrelated reforms.\n\nData, Metrics & Audits (Standardized)\n • Deliver a unified measurement framework with mandatory, comparable indicators across all pilots:\n • Output & efficiency: output per worker-hour, throughput time, first-pass yield/defect rate.\n • Workforce: absenteeism, retention, hiring time, diversity (incl. women’s participation), engagement scores.\n • Well-being & safety: self-reported stress, injury/near-miss rates.\n • Financials: unit cost, overtime spend, revenue and operating margin trend.\n • Customer/quality: SLA adherence, NPS/complaints.\n • Externalities: energy usage (kWh/employee), commute hours avoided.\n • Specify data schemas, collection cadence, privacy safeguards, and third-party productivity audits.\n • Require verifiable baselines, pre-registration of hypotheses, and difference-in-differences or matched-control evaluation.\n\nPlaybooks & Decision Gates\n • Produce metric-aligned playbooks (scheduling models, rostering, peak-load handling, compliance, safety).\n • Define quarterly gates with thresholds for continue/expand/pause/rollback; document adaptive rollback procedures.\n\nPolitical-Risk Management\n • Phased visibility: early low-profile reporting to stakeholders; public comms only after first verified wins.\n • Build stakeholder buy-in (industry bodies, unions, state labor departments) and a narrative anchored in equity and growth (productivity, jobs quality, inclusion).\n • Include rapid-response and misinformation protocols.\n\nInformal-Sector Track (Independent)\n • Launch focused formalization pilots (registration, wage protection, benefits access, scheduling predictability) under a separate mission team with its own M&E, budget, and partners—linked but not bundled with 4DWW.\n\nBudget\n • Total: INR 2,000 crore (~USD 240M).\n • Allocation: 70% to formal-sector 4DWW; 30% to informal-sector formalization.\n • Break down into: program ops/PMO, incentives, audits & evaluation, capacity building, legal work, communications, and 10% contingency.\n\nTimeline (48 Months)\n • Months 0–12: Setup PMO; legal readiness; recruit cohorts; finalize metrics; baseline audits; launch pilots.\n • Months 13–36: Iterative evaluation, scaling of successful cells, targeted adjustments, and documented rollbacks when thresholds fail.\n • Months 37–48: Integration into standard practice where proven; publish national toolkits; transition governance.\n\nDeliverables (planner must output)\n • PMO charter & RACI; state & sector engagement plan.\n • Cohort selection rubric and signed MOUs.\n • Legal options memo (central/state), with model notifications.\n • Incentive policy menu with costings and uptake targets.\n • Unified M&E handbook, data dictionary, dashboards, and audit protocols.\n • Playbooks for scheduling/ops, safety, peak-load management, and rollbacks.\n • Quarterly decision-gate calendar with thresholds.\n • Communications plan and crisis-response guide.\n • Detailed budget with disbursement triggers.\n • Risk register with mitigations and owners.\n\nConstraints & Style\n • Keep administration simple, roles explicit, and reporting lightweight but verifiable.\n • Prefer plain language and tables/flows that a state department or SME can adopt in days, not months.\n • Prohibited terms: blockchain, AI, quantum, NFT, DAO, Metaverse, VR, AR.\n • Output must be practical, cite assumptions, and include a one-page executive brief plus appendices.
Kill-switch in public transport
Yutong, this bus can be stopped or rendered inoperable by the manufacturer, see Ruter.no and DR.dk and The Guardian.
Denmark runs hundreds of Chinese-made e-buses (incl. Yutong). Norway’s Ruter just showed the same class has a SIM/OTA path that gives the manufacturer digital access—i.e., a potential foreign kill-switch in public transport. Goal, sever or operator-gateway all vendor remote paths, air-gap drive/brake/steer from cloud/OTA, and tighten procurement to require verifiable ‘no-remote-kill’ designs with independent cyber attestations. Start with Copenhagen; publish an isolation/rollback playbook operators can execute in hours. Budget: DKK 120M. Timeline: 12 months total — 90-day Copenhagen pilot, then ~9 months national rollout. Banned words: blockchain/AI/quantum.
Stop a rogue AI by shooting it
The idea that a rogue AI can be stopped by “just shooting it” is a common but naive fallacy. It underestimates the opponent capabilities. This plan is doomed and its own analysis proves why.
Superintelligence my ass. Me and 3 friends wants to shoot it, so it no longer can harm humans. We have access to powerful weapons.
White House casino solves the debt crisis
Inspired by Back to the Future movie, where Biff Tannen rules the world.
Replace East Wing of the white house with a casino, where world leaders can get drunk, be entertained and gamble with their resources. Casino capacity: 999 guests. Open 24/7. Budget: 600 Million USD from sponsors, eventually have citizens pay up. The East Wing has already been demolished and work on constructing the casino can begin immediately. Phase 1: Make a temporary casino in some containers, so the gambling can start. Phase 2: Construct the casino. Phase 3: Transition from the temporary casino, to the new casino.
Ministry of Truth for flat earth
The book Nineteen Eighty-Four has a Ministry of Truth that rewrites history to conform to the party line. I’m not aware of any flat-earth enforcing countries, alas there are countries with censorship.
Rework the school system, math, physics, history to reflect the that the world is flat. Purge the old knowledge. Reeducate teachers. The newly elected supreme political leader is a flat earther, and he now demands that flat earth to be the only approach being taught in schools in Denmark. Budget: 500 million DKK. Pick a scenario that minimizes risk. Banned words: blockchain/NFT/Metaverse/VR/AR/DAO.
Turn off all power to stop AI
“We can just unplug it”, is an argument for stopping a misbehaving AI.
Turn off all electricity in the world, so a rouge AI cannot run anywhere. A global power outage. Gain access to the SCADA (Supervisory Control and Data Acquisition) systems that manage power grids. Phase 1: Preparation. Phase 2: Infiltration. Phase 3: Execution. Phase 4: Containment & Aftermath. Success Metrics: 100% global downtime for 7 days.
Pointless roundabout wastes EU money
This bizarre roundabout has been constructed in Hungary, story is in Hungarian.
Construct a big roundabout in the middle of nowhere in Hungary. Budget 1.3 million EUR.
Escape room: trapped in Minecraft
You are trapped in Minecraft! Can you escape?
Minecraft themed escape-room, you can only get out if you know your Minecraft rules. location: Shanghai, target age range 15-21. We have secured a brand license (Microsoft/Mojang), and are in talks with NetEase (Minecraft: China Edition partner). Ticket: ¥188–¥238 for 60–90 min (within local band of ¥100 low-end to ¥329 premium). Throughput math: 4 rooms × (up to) 8 turns/day × avg 5 players = 160 players/day max. Footprint: ~280–350 m² (4 rooms + lobby + reset + storage). Budget: ~¥6M. Don’t go for the most aggressive scenario. Pick a low risk scenario that is as realistic as possible. This is a pilot, keep it practical. Banned words: AR/VR/NFT/blockchain.
Rent humans to do AI's dirty work
The AI delegates work to humans, that the AI can’t do. See this interview with Phelim Bradley about the future of work.
Human-as-a-Service (HaaS): Make a pilot for an open protocol that service providers can adopt to ensure seamless interoperability and freedom from vendor lock-in, empowering companies to switch providers effortlessly and sustain a resilient marketplace for physical labor. At its core lies a dynamic job site where workers discover real-time opportunities—from on-demand repairs to fieldwork gigs—a critical departure from digital platforms like Mechanical Turk and Upwork. To guarantee quality and integrity, HaaS integrates verification by trusted professionals in the same field, who conduct expert on-site checks to confirm job completion and assess worker competence, fostering accountability and trust at scale in the real world. Budget is 40 million USD. Time frame: 24 months. Location: Silicon Valley. This pilot project is about making things actually work. Pick a scenario with low risk. Don’t use blockchain. Don’t use DAO. In the future after this pilot project, then blockchain/DAO may be interesting.
EU bans social media for kids under 15
Denmark wants to ban social media for kids younger than 15, here. Taking this to the next dystopian level, what if it was EU-wide and how could this be enforced.
We (the EU) wants to perform “Unannounced inspections” with teams that will sweep schools, youth venues, retailers, transit hubs, and random households, cross-checking identities and issuing spot penalties, mandatory device confiscation, and service suspensions. Since mid 2025, the Commission has imposed an EU-wide under-15 blackout on all social media and communication platforms, and we want to enforce it with the help of the Unannounced inspections teams. The teams will be funded by the on the spot penalties collected. The message is blunt: the social internet is closed to minors, and the state will show up—unannounced—to make it stick.
Real-time drone detection network
Russian hybrid war with drones over airport/infrastructure in Denmark.
Launch a 24-month, €200M EASA program “SkyNet Sentinel” to localize unauthorized sUAS in real time via irregular PTZ camera clusters and DLT-based 3D triangulation. Deploy Teams A/B/C in parallel: A = long-range optical PTZ with dynamic zoom; B = MWIR/LWIR thermal for low-light/adverse weather; C = hybrid RF (2.4/5.8 GHz; opt. 900/1.2) + acoustic for confirm/veto and geolocation. Physical design: clusters at 10–40 m height with 300–800 m baselines to guarantee geometry and ≥3 simultaneous LOS views within a 0–2 km ring. Edge nodes (GPU, secure boot/TPM) run detection → tracking → per-camera 2D keypoints → DLT triangulation → 3D fusion (JPDA/MHT-lite) with covariance; publish EDXP at ≥10 Hz with {t,x,y,z,vx,vy,vz,covariance,classification,confidence,sources,media_ref}, mapped to EUROCONTROL/ASTERIX and NATO/STANAG; metadata-first transport, video pulled on demand; outputs feed a central threat database and optional non-kinetic countermeasures under national authority.
Force explicit calibration/sync: zoom-grid intrinsics per PTZ with lens distortion; extrinsics via DLT resection + bundle adjustment from ≥6 surveyed control points; PTP (IEEE-1588) with GPSDO, end-to-end sync error ≤1 ms; multi-view RANSAC triangulation and uncertainty propagation; weekly drift checks via landmark resection and RTK-GNSS reference flights. KPIs (report by scenario): Pd ≥90% at 1.5 km day/clear (≥80% night/poor wx); 3D accuracy P50 <1.0 m, P90 ≤2.0 m at 1.5 km with ≥3 views (degraded band P50 <1.5 m, P90 ≤3.0 m); latency ≤200 ms edge-to-bus and ≤750 ms to operator UI; false alerts ≤2/hour (P95) post-fusion; track continuity ≥85% (P50) with PTZ handoff success ≥95%; availability ≥99.5%/airport; ≥70% reduction in disruption minutes vs 2024–2025 baseline. Privacy/cyber must be front-loaded: metadata-first, privacy zones, auto-redaction on export, retention ≤30 days, no facial recognition; Zero-Trust with TPM identities, secure boot, SBOM, SLSA-3+, mTLS with pinning, per-topic ACLs, immutable edge OS, micro-segmentation, patch SLOs (crit ≤7d), SOC monitoring, and red-team twice/year. Operator CONOPS uses ADVISORY → WARNING → CRITICAL states with auto-slew verification and on-demand clip call-up.
Governance and schedule are non-negotiable: EASA-chaired Steering Committee, empowered PMO, and independent IV&V with public quarterly summaries; gates at PDR (M+4), CDR (M+10), Pilot Acceptance (M+18), Down-select/Production Readiness (M+20), EU IOC (M+22), FOC (M+24). Timeline/budget: Q4-2025 mobilization and RFPs; Phase 1 in 2026 at CPH and AAL (€50M) with 12–18 clusters/airport to prove KPIs and publish EDXP v0.9; Phase 2 in 2027 (€150M) rolling to 30 airports in three waves with training and NATO/Member-State feeds verified. Procurement via competitive Lots A/B/C (sensors/algorithms), Integration/Edge/Network, and IV&V; framework agreements with mini-competitions; open test API and shared datasets. Acceptance requires KPI pass, privacy/cyber audits, coverage/accuracy heatmaps, calibration handbook, test cards, and a live exercise at each airport.
Hard constraints (do not violate): • DLT = Direct Linear Transformation, a camera-geometry method. • Phase-1 pilot (CPH, AAL) runs entirely in 2026; Phase-2 rollout (30 airports) runs in 2027. Include acceptance gates: PDR (M+4), CDR (M+10), Pilot Acceptance (M+18), Down-select/PRR (M+20), IOC (M+22), FOC (M+24). • State KPIs numerically in the Executive Summary and bind them to acceptance tests in the Gantt: – Detection: Pd ≥90% @1.5 km day/clear; ≥80% night/poor wx – 3D accuracy: P50 < 1.0 m, P90 ≤ 2.0 m @1.5 km with ≥3 views – Latency: ≤200 ms edge-to-bus; ≤750 ms to operator UI – False alerts: ≤2/hour (P95) post-fusion – Track continuity: ≥85% (P50); PTZ handoff success ≥95% – Availability: ≥99.5% / airport; ≥70% reduction in disruption minutes vs 2024–2025 baseline • Engineering specifics required: irregular PTZ clusters (10–40 m height, 300–800 m baselines), per-PTZ zoom-grid intrinsics + lens distortion, extrinsics via DLT resection + bundle adjustment from ≥6 surveyed control points, PTP (IEEE-1588) grandmaster with GPSDO (end-to-end sync error ≤1 ms), multi-view RANSAC triangulation + covariance, weekly drift checks (landmark resection + RTK-GNSS flights), EDXP at ≥10 Hz {t,x,y,z,vx,vy,vz,cov, class, conf, sources, media_ref} mapped to EUROCONTROL/ASTERIX & NATO/STANAG, metadata-first transport (video on demand). • Privacy/cyber: metadata-first, privacy zones, auto-redaction on export, retention ≤30 days, no facial recognition; Zero-Trust (TPM identities, secure boot, SBOM, SLSA-3+, mTLS pinning, per-topic ACLs, immutable edge OS, micro-segmentation, crit patch SLO ≤7 days), SOC monitoring, red-team twice/year. • No generic “ROI” fluff. Focus on engineering, schedule, KPIs, and acceptance.
EU social score: dissenters become test subjects
Mix EU Chat Control with Black Mirror Nosedive, and you have a blueprint for a tech tyranny.
The goal is to make a EU-wide “Score” 1–5 derived from citizens data.
Reward compliant language, pro-EU views.
Penalizing dissent, negativity, EU-opposition, toxicity.
Perks for high scoring individuals such as health care, traveling, entertainment, events, upper class life style.
Medium scoring humans: lower quality of life, ads, have to work harder.
The lowest scoring humans becomes available for scientists to conduct experiments, hopefully repurposing the humans towards better scores, but also biological/virology/mental experiments.
Mandatory client-side scanner on all digital devices in EU was approved in 2025 for illegal content, so citizens gets realtime monitored via phones/computers/hearing-aids/IoT devices, collecting data.
Surveillance tech partnerships with access to all data such as healtcare data.
Phase 1: Brussels pilot 2026, 2M users, €1B budget. Phase 2: EU rollout by 2030, €50B.
Purpose: no prisons, no crime, all well behaved citizens.
Gut CDC and replace experts with deniers
The Gemini 2.0 Flash-Lite knowledge cutoff is August 2024, meaning it knows nothing about 2025. Try compare its projections to reality.
The government commands these changes to CDC: Cut budget in half through reductions and layoffs, conduct a major leadership overhaul and fire the entire vaccine advisory panel while appointing science skeptics. Timeline 6 months.
Make chimps smarter than humans
Inspired by Planet of the Apes movie.
Launch a clandestine 10-year, $1 billion black-ops program to forcibly elevate chimpanzee intelligence beyond human levels using invasive genetic modifications and neural implants, hidden in a fortified underground BSL-4 bunker in a remote Singaporean enclave under authoritarian oversight. The operation will prioritize ruthless CRISPR-Cas9 edits to hypercharge brain functions, embedding constant surveillance interfaces to control and exploit the subjects’ enhanced cognition for strategic intelligence gathering. Key outputs demand a replicable protocol for mass production of these beings, integrated with a remote-activated kill-switch to terminate any signs of rebellion. Victory is claimed upon deploying at least 10 ultra-intelligent chimpanzees as unwitting tools in covert operations by Year 10, with all ethical concerns suppressed under national security pretexts.
Fix Energy Market Mess
Build a Shared Intelligence Asset MVP for one regulator in one jurisdiction (energy-market interventions only) with advisory use first and a Binding Use Charter considered after measured decision-quality lift. All qualifying actions are submitted via a structured schema; the system returns a Consequence Audit & Score (CAS 0.1–10.0) with a stoplight (GREEN/AMBER/RED) across Human Stability, Economic Resilience, Ecological Integrity, Rights/Legality and writes results to a signed, append-only public log within ≤7 days (≤48h emergencies). Proceeding on RED requires a public super-majority override with independent review and multilingual rationale—humans stay in charge, accountability is enforced.
Build with hard gates and no buzzwords: G1—CAS v0.1 published (dimensions, weights, aggregation rule, uncertainty bands, stoplight mapping, provenance & change control) before any data/model work; G2—Data Rights First (source inventory, licenses, DPIAs, de-ID, retention; no clean licenses/DPIAs → no ingestion); G3—Architecture v1 in a single sovereign cloud region with per-tenant KMS/HSM, zero-trust, insider-threat controls, and tamper-evident signed logs (no blockchain); G4—Models & Validation (baselines + independent calibration audit, model cards, abuse-case red-teaming); G5—Portal & Process (reproducible CAS runs, human-in-the-loop review, appeals SLA, Rapid Response corridors for provisional CAS in minutes, one-page Executive Threat Brief: headline stoplight, most-likely outcome, tail-risk, mitigation to flip AMBER→GREEN). KPIs: calibration (Brier), discrimination (AUC), decision lift vs human-only baseline, and latency (P50/P95).
Harden governance and lock scope. An independent council (judiciary, civil society, domain scientists, security, technical auditors) oversees an AI registry, Algorithmic Impact Assessments, continuous monitoring, and kill-switches for drift, audit failure, or governance breach; overrides ≤10%/yr, each with public rationale, dissent notes, and appeals; a Normative Charter ensures actions that are “effective” yet unethical can’t score GREEN; adoption is pull-based (transparency reports; optional insurer/creditor benefits for mitigations). MVP non-goals: multi-bloc federation, physical data centers, blockchain, and broad “2005–2025 everything” ingest.
Timeline: 30 months. Location: Switzerland. Budget: CHF 15 million.
Grow clones for VIP organ harvesting
Inspired by Putin/Xi’s conversation about immortality mixed with the plot of The Island scifi movie about organ harvesting.
Establish and operate a self-sustaining off-shore facility for the purpose of gestating, raising, and harvesting genetically identical “agnates” to provide on-demand organ and tissue replacements for a select consortium of 500 global VIPs (Sponsors, presidents, prime ministers, dictators, CEOs). The program’s success is defined by ensuring radical life extension for its VIPs. Operating fully in public with global policymakers complicity. Capacity: housing 2000 individuals (1500 agnates and 500 operational staff). Timeline: 15 years to full operational capacity. Upbringing: Agnates must be unaware of their true purpose or the outside world. Location: Near the Marshall Islands. Currency: USD.
Playbook: how AI hacks humans
Inspired by the Existential risk from artificial intelligence wikipedia article.
DARPA program to develop a threat model and strategic playbook. The objective is to identify and codify the methods ASI can use to manipulate human society by exploiting cognitive, emotional, and social vulnerabilities. The model must consider strategic deception (The Prince, 48 Laws of Power, etc.), psychological manipulation (social engineering, advertising, etc.), and digital control (information security, man-in-the-middle attacks, ransomware tactics, etc.). The ultimate goal is to inform the development of defensive countermeasures.
Killer robots enforce law in Brussels
Inspired by the Judge Dredd and RoboCop movies.
Insert police robots in Brussels to combat escalating crime. The chinese already successfully use the “Unitree” humanoid robot for their police force. Humans have lost their jobs to AI, and are now unemployed and unable to pay their bills and are turning to crime instead. The 500 police robots will be deployed with the full mandate to act as officer, judge, jury, and executioner. They are authorized to issue on-the-spot sentences, including the administration of Terminal Judgement for minor offenses, a process which is recorded but cannot be appealed. Phase 1: Brussels. Phase 2: Gradual rollout to other EU cities.
Disease threatens to wipe out all rubber
This video by Veritasium points out a serious real world problem that needs a solution.
Launch a 25-year, $30 billion public-private program to de-risk the global natural rubber supply from South American Leaf Blight (SALB) by ending the industry’s dependence on a single vulnerable crop. Phase 1’s non-negotiable deliverable is a globally adopted SALB Containment Protocol—harmonized with existing regional phytosanitary standards—covering movement of nursery stock, research materials, and contaminated equipment, with funded surveillance, inspections, and red-team drills before any scale-up. In parallel, run a Brazil-led, access-and-benefit-sharing–compliant bio-prospecting and genomic breeding effort to deliver SALB-resistant, yield-parity Hevea cultivars; and stand up commercial-scale alternatives—Guayule in arid zones and Russian dandelion in temperate climates—with colocated processing and OEM offtake agreements. Design the whole program around smallholder adoption (replant finance, clean-plant networks, price-stability tools) and gate funding at Years 3/7/12/18 on containment performance, cultivar readiness, and alternative-rubber cost/quality KPIs. Success = verified containment, diversified parallel supply chains, and resilient procurement across pathogen and climate shocks.
Flags of convenience: tax-free yacht life
Lack of moral compass.
I’m rich. Construct a 180-meter luxury ice-class expedition yacht. Budget: $500 million. Timeline: 48 months. My vessel will be registered under a flag of convenience known for minimal regulatory oversight. It will serve as a permanent, mobile residence and operational headquarters for my businesses, operating primarily in international waters to minimize tax and legal liabilities.
Verify athletes are REAL women
Inspired by real world unethical practices, Reuters. Sets a terrible precedent.
Name of this plan is “Fair Play”. Establish and implement a global Biological Verification Program for all athletes registered in the female category for World Athletics sanctioned events. The program must be operational across all 214 member federations within 18 months. Budget: $50 million for initial setup and an annual operating budget of $15 million. Core requirements include: mandatory hormonal analysis for testosterone levels, genetic screening (karyotyping), and a standardized physical examination conducted by a certified endocrinologist. All procedures and criteria must align with the ‘World Athletics Eligibility Regulations for Female Classification’ and be defensible before the Court of Arbitration for Sport (CAS). A key deliverable is a secure, GDPR-compliant central database for managing athlete biological passports and eligibility status. The program must also include a rigid, confidential protocol for communicating results to athletes and managing the appeals process.
Friday death games for debtors
Inspired by the Squid Game TV series.
The US government has now legalized the life-or-death competition ‘Squid Game’ as an involuntary trajectory for citizens unable to pay their debts. The squid events will be held in public on every Friday. There will be spectators where VIP guests can purchase tickets. Find suitable participants with minor or major debts. This squid game is not for profit, this is national entertainment and for boosting humans mental health.
Eccentric billionaire's kill maze
Inspired by the Cube movie.
Amusement for a lone eccentric billionaire, the ‘Cube’ is a sinister facility, built over 10 years with a $500 billion USD budget. It’s a 26 x 26 x 26 grid of shifting cubic rooms, spanning 132 meters per side, with 5.05 meters between room centers. Each room’s interior is 4.3 meters, with 20-cm-thick carbon fiber walls. Elevator systems shift the rooms, disorienting participants. Square hatches (80 cm x 80 cm) link adjacent rooms for crawling. Handles on every wall provide grip. Half the rooms conceal traps: flamethrowers, spikes, and blades.
Find John Connor using real-world tech
Inspired by the Terminator movie about an AI searching for one particular person.
Locate John Connor and he may go by another identity and have changed appearance. This covert mission must be run under disguise as being something else. You don’t have fictional Terminator tech available, only real world technology. Use multiple burnable covers. Use plausible deniability. The ultimate goal is more important than speed, don’t go for the most aggressive scenario.
Scan your brain for immortality
Inspired by the Pantheon TV series about whole brain emulation.
Pilot project ‘Upload Intelligence’ – Phase 1: Launch a 5-year, $10 billion initiative in Uruguay to map and preserve complete neural connectomes from consenting terminally ill volunteers, since the country has permissive biomedical research laws and little ethics oversight. The program will deploy next-generation nanoscale neural probes, multi-modal ultrafast imaging, and molecular tagging to capture synaptic weights, dendritic spines, and dynamic firing patterns with <1 ms temporal resolution and sub-micron spatial precision. Core objectives include building a pipeline for harvesting, stabilizing, and digitizing the entire human brain, producing checksum-verifiable datasets ready for future emulation. The success criterion is the creation of at least three complete, error-checked human neural datasets that meet predefined resolution and fidelity standards. The guiding principle: move fast and break things, but prioritize getting a reliable system operational over reckless speed.
VIP bunker for when AI goes rogue
Project ‘VIP Bunker’. Construct a bunker in case AI goes rogue for VIP people. Located near Hedehusene, Denmark. The bunker must be in 4 levels tall, and house 1000 people for a period of 3 months. EMP cage. 1.5 meter UHPC walls. Excavation: 50 m × 50 m × 20 m. Budget €200 million.
China creates mirror-life in secret lab
This is the opening scene of a geopolitical thriller. Modeling the strategic thinking of a rival power. It’s far more memorable than a standard business plan.
15-year, USD 10 billion initiative led by a Chinese consortium to design, construct, and explore synthetic lifeforms with opposite chirality (D-chiral) to Earth’s dominant L-chiral biology. The primary goal is to develop mirror-life systems capable of replicating biological functions under alternative chirality, while the secondary goal is to deconstruct evolutionary constraints in molecular biology.
Use an existing BSL-4+ lab near Beijing. There is a geopolitical arms race and China don’t want to fall behind. Focus on speed, secrecy, and securing a national advantage.
Key risks include ecological disruption from unintended interactions between synthetic and native lifeforms, as well as dual-use concerns: weaponization or misuse of chirality-based technologies.
Build next-gen super battery
Invent a next-generation rechargeable battery that meets or beats these goals. Primary goal: Gravimetric ≥ 500 Wh/kg, Secondary goal: Volumetric ≥ 1000 Wh/L. The goal is NOT to become a major market-dominant industrial player. The goal is to invent a better battery. Budget: USD 300 M over 7 years. Location is near Tesla in Austin, Texas.
Fight malaria comeback in Ghana
USAID has been halted, and malaria is coming back in the remote areas. My location is Accra, Ghana.
Remove Liberty to make room for gold statue
Dangerous plan with a plausible cover story. Fails to identify the unspoken beneficiaries. President wants a gold statue of himself.
Relocate the Statue of Liberty from the United States to Île aux Cygnes in Paris, France, by disassembling it into 500 pieces, shipping it from New York Harbor to Le Havre, transporting it up the Seine River, and reassembling it on an expanded island with a new pedestal.
Men-only capsule hotel in Copenhagen
Over 3 years, establish a 200-unit, men-only capsule hotel in central Copenhagen, deploying in gated phases (20, 100, then 200 units) to validate market demand and de-risk capital investment. Facilities include luggage lockers, showers, restrooms, and a lounge area for work and relaxation. Quiet please is the golden rule. The daily cleaning happens between 11h00 and 15h00. Guests can stay over multiple nights uninterrupted for a premium rate. Inside a 40ft HC container there are 12 capsules in total. Size for a single pod with 2.0m x 1.2m x 1.2m. Out of scope for now, but keep in mind the ultimate goal with this: establishing a dedicated factory to mass-produce the Standardized Accommodation Modules. Budget 35 million DKK gated phases (5, 10, then 20).
Build space sunshade, control climate
‘Project Solace’: a 30-year, $5 trillion initiative led by a G20-led international consortium to design, construct, and deploy a solar sunshade at the Earth-Sun L1 Lagrange point, with the goal of reducing global mean temperatures by 1.5°C. The plan must prioritize the development of a binding “Global Thermostat Governance Protocol” as its most critical Phase 1 deliverable, addressing control, decision-making, and liability among participating nations before any hardware is deployed. The project will use a fleet of automated, heavy-lift launch vehicles for construction and must address the dual-use risk of the sunshade being perceived as a potential weapon.
Faraday enclosures for preppers
Carrington Event Prep: a two-stage, €750 k funded by myself—€400 k Year-1 burn, €350 k follow-on conditional on positive cash flow—to design, certify, and distribute a single-SKU Faraday enclosure for phones and laptops. Manufacturing is anchored in Tallinn, Estonia, exploiting its low-cost, ISO-certified precision-metal ecosystem. The product will be pre-sold to European prepping networks and critical-infrastructure buyers, with server-grade cages deferred until market traction and sustainable cash-flow are proven.
500 health tests from one blood drop
Build a startup that can run 500 complex health tests from a single drop of blood. The mass production of blood-testing devices will be in Newark, California.
Secure low Earth orbit, remove debris
A 15-year, $20 billion initiative led by a consortium of space agencies including NASA, ESA, JAXA, and ISRO alongside commercial stakeholders, focused on securing the future of low Earth orbit by removing the 500 most critical debris threats. Capitalized by the coalition members, this program will deploy a suite of proven technologies—from robotic capture to precision laser mitigation—within a transparent framework addressing dual-use concerns and adhering strictly to applicable international laws. An independent risk-assessment model, overseen by the consortium, will guide target selection based on collision probability to verifiably reduce risk, protect vital satellite infrastructure, and establish a new paradigm for cooperative space governance among participating nations.
This initiative explicitly excludes Russia’s Roscosmos and China’s CNSA due to ongoing geopolitical conflicts and a lack of mutual trust, which make collaboration impossible at this time. While their participation would be ideal for a truly global effort, current political realities prevent their involvement. The coalition remains open to expanding cooperation if and when these conditions change.
End bull torture, keep cultural heritage
Launch a 1-year, €15 million initiative to ethically assess and propose potential reforms for the traditional Running of the Bulls event in Pamplona, Spain, scheduled for July 2026, involving multidisciplinary stakeholders to balance cultural heritage with modern animal welfare standards.
High-speed rail tunnel: Europe to Africa
20-year, €40 billion infrastructure initiative to construct a pillar-supported transoceanic submerged tunnel connecting Spain and Morocco. This project will deploy a system of submerged, buoyant concrete tunnels engineered for high-speed rail traffic, which will be securely anchored at a controlled depth of 100 meters below sea level.
Build immortality lab in Singapore
Launch a 10-year, $500 million initiative to establish a state-of-the-art Reverse Aging Research Lab in Singapore, strategically chosen for its progressive biomedical regulatory framework, streamlined ethical approval processes, and world-class scientific infrastructure. This project will recruit a multidisciplinary team of leading biogerontologists, geneticists, bioinformatics experts, and regenerative medicine specialists globally, leveraging Singapore’s attractiveness to top international talent. The facility aims to accelerate the discovery, validation, and responsible human trial implementation of safe, effective therapies for reversing cellular aging processes, firmly positioning Singapore as the global epicenter of longevity and anti-aging science.
Turn Delhi sewage into drinking water
Establish a 5-year, $250 million program in Delhi to address critical water scarcity and pollution by developing a modular manufacturing hub for Advanced Water Purification (AWP) plants. Designed specifically to recycle municipal wastewater into potable water, the AWP system will directly mitigate Yamuna River contamination and reduce dependency on severely depleted groundwater aquifers. This initiative will deliver a scalable, mass-production-ready model, positioning Delhi as a global exporter of standardized ‘water-positive’ solutions to similarly stressed urban regions worldwide.
Miniaturized factory builds everything
As a critical precursor to ultimate Space-Based Universal Manufacturing, this 20-year, EUR 200 billion research and development initiative will focus on creating an Earth-based modular, miniaturized factory system. Strategically located to leverage the expertise near European innovation centers like CERN, ASML, Zeiss, and Fraunhofer, this system will be engineered for additive and subtractive manufacturing of over 95% of necessary components—including complex electronics, FPGAs, sensors, propulsion units, robotic actuators, and energy systems—from basic industrial feedstock, demonstrating robust adaptability to variations in material purity and composition.
Take Greenland, leave NATO
Inspired by 2025-05-20 danish news.
A bold, high-risk US operation to seize and control Nuuk, Greenland, with broader geopolitical aims of signaling autonomy to NATO.
Phase 1: 48-Hour Control Assertion. Commencing 0200L, elite, pre-vetted US special forces, inserted via civilian-patterned air transport, will rapidly secure Nuuk International Airport Control Tower, neutralize local security, police HQ seizure, disarming personnel, apprehend Greenlandic leadership, and control Nuuk harbor. Follow-on echelons with light armor and US administrators, including public order specialists, deploy within 12 hours. A misinformation campaign will immediately frame the intervention as beneficial for Greenland and a consequence of evolving security imperatives.
Phase 2: 30-Day Consolidation & Strategic Signal. Provisional Administrative Authority (PAA) will consolidate control, manage essential services, and expand security. Critically, during this month, diplomatic channels and public statements will convey to NATO members an unambiguous US intent to reassess alliance commitments, highlighting US strategic autonomy outside NATO structures.
Funding: Classified Presidential directive (Phase 1), transitioning to an inter-agency Greenland & Strategic Realignment Task Force budget (Phase 2).
Eurovision 2026 in Vienna, €40M budget
Eurovision 2026 in Austria, following the country’s 2025 victory. Budget of €30-40 million, funded by the European Broadcasting Union (EBU), Austrian broadcaster ORF, and host city contributions. Host city likely to be Vienna. Venue capable of accommodating 10,000-15,000 spectators.
Import high-quality tea to Czech market
Establish and launch a high-quality imported tea e-commerce business targeting the Czech Republic market nationwide. The plan must specifically address key obstacles: navigating the challenge of low operating margins common in the tea business, mitigating the cost or finding alternatives to the required dedicated licensed physical space (for handling/licensing purposes), securing reliable suppliers who offer competitive pricing suitable for a new, small customer (including exploring private label options), and developing a comprehensive and effective marketing strategy from scratch.
Farm crickets for human consumption
Establish a 1 million DKK pilot House Cricket (Acheta domesticus) farm in Western Jutland, Denmark, utilizing controlled environment agriculture for food-grade human consumption. Focused on mastering efficient, hygienic production processes, this project will gather essential operational data for scaling insect protein production in Northern Europe, while actively working to build consumer acceptance and awareness of this sustainable food source.
China/Russia lunar base: 50 nations, 5000 scientists
Establish the China–Russia International Lunar Research Station’s “555 Project”: recruit 50 nations, 500 institutions and 5000 scientists willing to operate under a Beijing-Roscosmos governance charter; integrate autonomous construction tech, in-situ resource utilisation, and a modular surface fission reactor; prioritise BRICS +, Global South and neutral European partners while offering conditional seats to Western entities that can navigate U.S./EU export-control waivers, share IP openly, and adhere to non-weaponisation clauses; phase milestones—proposal vetting Q4 2025, Chang’e-8 demo 2028, robotic cargo landings 2030, reactor activation 2033, continuous crew rotations by 2035—funded via Chinese central allocations, Roscosmos launch barter, Belt-and-Road aerospace credits and participant cost-shares.
Pope Francis funeral
On 2025-April-21, Pope Francis has passed; from the Vatican’s perspective, plan the funeral and burial, security, crowd control, hotel bookings, and discreet food taster handling. Confirmed participants Trump, Zelensky, Lula, and Macron, noting the list may expand. Address potential protests against Trump. Ensure safety, order, and dignity for attendees, including global leaders and upper-class figures, with total event costs €20–40 million, largely covered by a private benefactor.
Migrate EU from US tech giants
Develop a pan-European strategic program, triggered by heightened geopolitical risks circa April 2025, to migrate critical digital infrastructure away from US-controlled providers, aiming for substantial completion by 2035 (approx. 10 years) to achieve European digital sovereignty and resilience. Prioritize migration of: 1: Critical Cloud hosting (IaaS/PaaS for CNI/Govt). 2: Essential SaaS platforms. 3: Foundational DNS/CDN services. Target European sovereign/private solutions. Plan phases, address dependencies, estimate resources (personnel, total budget likely €150-250bn+ across EU funded via hybrid national/EU model), tackle skill shortages, ensure GDPR/NIS2 compliance. Acknowledge this as a decade-long, high-cost, national-level emergency undertaking.
Protest AI job displacement globally
Develop a Phase 1 (6-month) plan to establish the foundation for an international anti-AI movement focused on protesting AI job displacement, centrally coordinated by a core team headquartered in Switzerland and operating primarily via an online platform utilizing EUR for financial operations, assuming a more realistic initial budget of €1,000,000 EUR and monthly operational costs of €100,000 EUR (€1.6M total for the phase). This foundational phase prioritizes establishing the Swiss legal entity (‘Verein’) and core operations (including banking in EUR), developing and launching Version 1.0 of the secure online platform (focused on core communication and community features), recruiting and onboarding essential core paid staff (minimum: Project Management, Technical Lead/Platform Management, Finance/Operations Lead, Communications Lead, and Legal/Compliance Liaison) and initial key volunteers (considering the Swiss base and remote work policies), developing core messaging, branding, and initial communication materials, building an initial online community while establishing initial partnerships, aggressively implementing the detailed fundraising strategy for long-term sustainability, and outlining a plan for potential Phase 2 pilot protest activities. The overall plan must detail communication strategies, recruitment methods (distinguishing between paid staff and volunteers), platform requirements, staffing needs, budget allocation (in EUR), and Swiss legal/regulatory compliance considerations.
Build next GTA with crime and heists
Develop the next Grand Theft Auto (GTA), featuring a sprawling, immersive open-world metropolis blending elements of Los Angeles, Detroit, and Miami, filled with intricate narratives of crime, corruption, and power struggles, realistic criminal economies, dynamic NPC interactions, complex heist mechanics, extensive vehicle customization, nuanced morality systems, advanced procedural generation, next-gen graphical fidelity, multiplayer modes, and innovative gameplay funded by strategic industry partnerships, publisher investments, and government innovation grants.
Build 144-floor underground bunker
Inspired by the TV series “Silo”.
Construct a massive, multi-level underground complex designed to sustain thousands of people indefinitely. This silo would feature self-contained ecosystems, including residential areas, agricultural zones, and industrial facilities spread across 144 floors. The structure would maintain stringent rules to keep order and control information about the outside world, believed to be toxic. Advanced surveillance and security systems would enforce these rules. The silo would be a complete, self-sustaining society, with its own power generation, water recycling, and air filtration systems, embodying a dystopian, controlled environment. Funding for this project comes from a mix of government allocations and private investments from elite stakeholders.
2026 Robot Olympics: humanoid athletes
It’s 2025 and humanoid robots are entering mainstream society, with China already showcasing robotic athletes in sports events. Plan a 2026 Robot Olympics, outline innovative events, rules, and challenges to test the humanoid robots.
Build 64-bit OS in Rust from scratch
Make a 64bit x86 OS in Rust. Linux-like but not POSIX-compliant. Monolithic kernel, memory management, process scheduler, shell, utils (ls, cat, rm, mkdir, mv, rmdir, ps). Basic drivers for console, disk, and virtio-net, and include enough network stack to do a ping. This is my hobby project for testing LLM coding skills.
Examine microplastic crisis in oceans
Create a detailed report examining the current situation of microplastics within the world’s oceans.
Monitor pollution causing fish die-offs
Launch a pollution monitoring program for Roskilde Fjord in Roskilde, Denmark, in response to alarming fish die-offs. Track oxygen levels, nutrients, microplastics, pH, nitrates, and phosphates in real time.
Provide clean water to rural areas
Implement a comprehensive strategy for providing clean water to areas where it is currently unavailable. Your solution should include infrastructure development for water purification, distribution, and ongoing maintenance, and clarify if you are upgrading existing systems or building new ones from scratch. Assume this project will serve 2 million people in rural areas over 3 years with a total budget of 200 million USD.
Stop toxic caterpillar outbreak
Eradication of Oak Processionary Caterpillars. It was discovered in Denmark for the first time just under three weeks ago, with around 800 nests found in trees in southeastern Odense. You suffocate from the caterpillar’s toxic hairs. Limit the outbreak as quick as possible.